1.Transportation Method
After production, Yaheng Tengfei's third-generation foldable container homes are directly folded and loaded for transportation. With a collapsed height of only 450mm, they can be transported efficiently, with ordinary self-lifting trucks capable of carrying around 6 units. Using a 17.5m truck, up to 20 units can be transported, saving customers approximately 50% in freight costs, whether for local or long-distance projects.
2.Installation Process
During the installation of Yaheng Tengfei's third-generation foldable container homes, non-workers are advised to stay away from the installation area to prevent accidents. The installation begins by checking the stability of the wire ropes, lifting the main frame, and securing it in place. Support rods are placed in the middle of the container to maintain stability. Walls are then pushed open and secured with screws, followed by the installation of walls with doors and windows. The foldable container is lifted to the designated position and safely lowered once the area is clear.
The entire installation process is remarkably fast and convenient, taking about 3 minutes for a single container under the guidance of our professional team. With three people, up to 600 square meters of container homes can be installed in a day.