The Changsha Square Pod Hospital covers an area of approximately 113,800 square metres, with a total construction area of 48,000 square metres and 2,320 ward beds, including 50 emergency ward beds and 216 accommodation rooms for medical and nursing staff. All the buildings adopt assembly and modular design, through factory prefabrication and processing and on-site assembly, to achieve rapid construction under the premise of meeting the functional requirements of the hospital.
The project uses 1,200 square metres of Tengfei prefab container homes and 50 flat pack container, covering multiple functional areas. At present, after more than 2,000 builders working day and night, the project has been successfully completed at the end of April, reaching the condition of being put into use.